Section 2 – rigging installation – Pro Boat PRB2450 User Manual

Page 4

Advertising
background image

4

5. Locate the main sail boom. Slide the

screw through the eyelet and use a

Phillips screwdriver to secure the end of

the boom. Do not over tighten as the sail

boom will move as the sails are adjusted.

Apply a drop of threadlock on the nut and

thread it onto the screw from the bottom

of the boom mount.

6. Locate the end of the main sail marked

"G". Pass the line tied to the main sail

through the hole in the rear end of the

main sail boom. Pull the line until the

main sail is taut, and the distance

between the boom and sail is between

3/4-inch and 1

1

/

4

-inch. Secure the excess

line by wrapping it around the cleat and

placing the end of the line in the notches

of the cleat.

7. Locate the other end of the main sail.

Pass the line tied to the main sail through

the hole in the boom mount. Position the

line so the distance between the boom

and sail is equal to the other side of the

sail. Secure the excess line by wrapping it

around the cleat and placing the end of

the line in the notches of the cleat.

Note

: Do not adjust the tension of any

of the lines at this time. This will be

done in Section 4, “Adjusting the

Rigging Cables.”

Section 2 – Rigging Installation

Advertising