Section 2 – rigging installation – Pro Boat PRB2450 User Manual

Page 6

Advertising
background image

6

13. Locate the jib sail boom. The end of

the jib boom with the cleat should be on

the top and nearest the front of the boat.

Pass the rigging line from the front of the

jib sail into the hole on the end of the

boom.

14. Position the line so the distance

between the boom and sail is between

3/4-inch and 1

1

/

4

-inch. Secure the excess

line by wrapping it around the cleat and

placing the end of the line in the notches

of the cleat.

15. Repeat Step 17 for the other end of

the jib sail.

Hint

: The jib boom will be parallel to

the bottom of the jib sail once Steps 17

and 18 are complete.

16. Carefully unwrap the bow rigging

cable marked "A." Attach the rigging cable

to the fitting at the bow of the boat

marked "A."

17. Carefully unwrap the stern rigging

cable marked "B." Attach the rigging cable

to the fitting at the stern of the boat

marked "B."

Section 2 – Rigging Installation

Advertising