Carrier 48TCA04---A12 User Manual

Page 78

Advertising
background image

78

source for a 3V control system, the PremierLink controller

is not required to be on the same CCN bus but it is

recommended. Linkage will be active when it is initiated

from the Linkage thermostat or the 3V Linkage

Coordinator through CCN communications and requires

no configuration. Only one device can be linked to the

PremierLink controller.

Once Linkage is active, the PremierLink controller’s own

SPT, temperature setpoints, and occupancy are ignored

and the controller will use the information provided by the

remote linkage device. The following information will be

received from the remote linked device and can be viewed

in the maintenance display table:

S

Supervisory Element

S

Supervisory Bus

S

Supervisory Block

S

Average Occupied Heat Setpoint

S

Average Occupied Cool Setpoint

S

Average Unoccupied Heat Setpoint

S

Average Unoccupied Cool Setpoint

S

Average Zone Temp

S

Average Occupied Zone Temp

S

Occupancy Status

In return, the PremierLink controller will provide its SAT

and operating mode to the linked device.

It will convert its operating modes to Linkage modes. See

Table 30.

Table 30 – Linkage Modes

ROOFTOP MODE

VALUE

LINKAGE MODE

Demand Limit

N/A

N/A

Heat

3

Heating

Cool or Free Cooling

4

Cooling

IAQ Control

N/A

N/A

Temp. Compensated

Start Heat

2

Warm---up

Temp. Compensated

Start Cool

4

Cooling

IAQ Purge

6

Pressurization

Occupied

(Indoor Fan ON)

4

Cooling

Unoccupied Free

Cool

5

Unoccupied Free

Cooling

Fire Shutdown

7

Evac

Factory/Field Test

1

Off

Off

1

Off

The PremierLink controller will generate a Linkage

Communication Failure alarm if a failure occurs for 5

consecutive minutes once a Linkage has previously been

established. It will then revert back to its own SPT,

setpoints and occupancy schedule for control. For this

reason, Carrier strongly recommends that an SPT be

installed in the space on open plenum systems or in the

return air duct of ducted return air systems to provide

continued

backup

operation.

When

Linkage

communication is restored, the controller will generate a

return to normal.

For more information on how the PremierLink controller

is used in conjunction with the Carrier 3V control system,

contact your CCN controls representative.
IMPORTANT: The PremierLink controller should not be
used as a linked air source in a ComfortIDt VAV system.

The ComfortID VAV system will NOT function correctly
when applied with a PremierLink controller as the air
source, resulting in poor comfort control and possible
equipment malfunction.
NOTE: The PremierLink controller can be used as an air
source in a 3V Pressure Independent (PI) System (a 3V

Linkage

Coordinator

with

ComfortID

PI

Zone

Controllers), but it should not be used as an air source
with ComfortID controllers unless a 3V zone controller is
used as the Linkage Coordinator. Contact your Carrier
CCN controls representative for assistance.
Demand Limit — If the demand limit option is enabled,

the control will receive and accept Redline Alert and

Loadshed commands from the CCN loadshed controller.

When a redline alert is received, the control will set the

maximum stage of capacity equal to the stage of capacity

that the unit is operating at when the redline alert was

initiated.

When loadshed command is received the control will

reduce capacity as shown in Table 31.

Table 31 – Loadshed Command — Gas and Electric

Heat Units

CURRENT CAPACITY

NEW CAPACITY

CMP1

DX Cooling OFF

CMP1+CMP2

CMP1

HS1

Heat OFF

HS1+HS2 (+HS3)

HS1

The controller will have a maximum demand limit timer

of 1 hour that prevents the unit from staying in load shed

or redline alert longer than 1 hour in the event the

controller loses communication with the network load

shed module. Should the maximum demand limit timer

expire prior to receiving the loadshed device command

from CCN, the control will stop demand limit mode and

return to normal operation.

RTU--MP Sequence of Operation

The RTU--MP will control the compressor, economizer

and heating outputs based on its own space temperature

input and setpoints. An optional CO

2

IAQ sensor mounted

in the space can influence the economizer minimum

position. The RTU--MP has its own hardware clock that is

set automatically when the software is installed on the

board. The RTU--MP’s default is to control to occupied

setpoints all the time, until a type of occupancy control is

set. Occupancy types are described in the scheduling

section. The following sections describe the operation for

the functions of the RTU--MP. All point objects that are

referred to in this sequence will be in reference to the

objects as viewed in BACview

6

Handheld.

Scheduling
Scheduling is used to start heating or cooling (become

occupied) based upon a day of week and a time period and

48TC

Advertising