Slant fin corp – Slant/Fin CHS-FS-40 User Manual

Page 2

Advertising
background image

CHS 85-399 CHS Floor Stand Installation Instructions

Slant Fin Corp.

2


Kit Contents
















Assembly Instructions

(Steps 1-

4)




No. Item Description
1. Left Rail
2. Right Rail
3. Top Cross Member
4. Middle Cross Member
5. Bottom Cross member
6. Floor Anchor Brackets x 8
7. Leveling Legs x 4
8. 3/8” x 3/4” Bolts x10
9. 3/8” Split-lock Washers x 10
10. #14 x 3/4” Drill-point screws

x 2 (not shown)

2. Connect the Top and Middle Cross Members

to the Rails using eight (8) of the

3/8” x 3/4”

bolts and 3/8

” Split-lock Washers.

1. Install Leveling Legs into the bottom of the

Right and Left Rails. Leave a minimum of 1/2" of
the Leveling leg exposed for attaching floor
anchors in step 5.

Advertising