Slant fin corp – Slant/Fin CHS-FS-40 User Manual
Page 2
Advertising

CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
2
Kit Contents
Assembly Instructions
(Steps 1-
4)
No. Item Description
1. Left Rail
2. Right Rail
3. Top Cross Member
4. Middle Cross Member
5. Bottom Cross member
6. Floor Anchor Brackets x 8
7. Leveling Legs x 4
8. 3/8” x 3/4” Bolts x10
9. 3/8” Split-lock Washers x 10
10. #14 x 3/4” Drill-point screws
x 2 (not shown)
2. Connect the Top and Middle Cross Members
to the Rails using eight (8) of the
3/8” x 3/4”
bolts and 3/8
” Split-lock Washers.
1. Install Leveling Legs into the bottom of the
Right and Left Rails. Leave a minimum of 1/2" of
the Leveling leg exposed for attaching floor
anchors in step 5.
Advertising