Slant fin corp – Slant/Fin CHS-FS-40 User Manual
Page 4
Advertising
CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
4
Boiler Mounting Instructions
(Steps 5-
9)
6. Remove the Wall-Mount Bracket (B) from
the back of the boiler and discard; keep the
screws for use in step 8. Upper Bracket (A)
remains on the boiler.
Wall-Mount
Bracket (B)
Upper Bracket (A)
7. With the help of an assistant, hook the Upper
Bracket (A), mounted to the boiler, onto the Top
Cross Member of Floor Stand
– ensure the bracket
fully engages. See Reverse View.
Upper bracket (A) hooked
over Top Cross Member
Reverse View (Step 7)
Advertising