Slant/Fin CHS-FS-40 User Manual

Page 5

Advertising
background image

CHS 85-399 CHS Floor Stand Installation Instructions

Slant Fin Corp.

5













































8. Fasten the Boiler Support Bracket to the bottom

of the boiler using the screws removed in step 6.
Before tightening, ensure the boiler is plumb.

10. Check to ensure the boiler is level

– correct if

necessary using Leveling Legs. Proceed with the
boiler installation

– see detailed Installation

Instruction provided with the boiler.

9. Secure the Boiler Support Bracket to the

Middle Cross Member using #14 x 3/4” drill-point
screws.

Advertising