Cementing pvc, abs or cpvc pipe and fittings, Installation instructions (cont’d) – Sears POWER MISER 153.335914 User Manual
Page 17
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
![background image](/manuals/718244/17/background.png)
Installation Instructions (cont’d)
VENTING SYSTEM EXAMPLE INSTALLATIONS
FOR ALL MODELS (cont’d)
2. Horizontal runs require a minimum /*" rise per foot.
3. A vertical run can be no more than 20',
4. The total vertical and horizontal run cannot exceed 35'.
CEMENTING PVC, ABS OR CPVC PIPE AND FITTINGS
Read and observe all safety information printed on primer,
cleaner, and cement containers.
DANGER
Primer,
cleaner,
and
cements
are
extremely
flunmable.
They are harmful or fatal if swallowed. The vapors are
harmful. They may irritate eyes and skin and can be
absorbed through the skin.
PRECAUTIONS
Always store primers, cleaner, and cements in cool, dry,
well ventilated places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well
ventilated
areas.
Wear
impervious
clothing
while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting, and cail a physician or poison
control center immediately. If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of
eye and skin contact, immediately flush with plenty of
water for 15 minutes and seek medical attention if irri
tation persists. KEEP OUT OR REACH OF CHILDREN.
All primers, cleaners, and cements must meet all local codes and
applicable standards of the American Society For Testing
Materials Standards,
ing sure contents are liquid. Do not use if found to be lumpy or
ielTy-lil
Before using primers, cleaners, and cements, stir or shake, mak
ing sure c(
jelly-like.
1. Cut pipe ends squarely removing all burrs and dirt.
2. Dry fit pipe and fittings to be connected for proper fit.
3. Clean pipe and fitting with a primer/cleaner.
4. Apply a thin coat of cement to fitting, avoiding puddling
inside.
5. Apply a liberal coat of cement to pipe leaving no voids.
6. QUICKLY assemble parts while cement is fluid! If you wait
too long, re-coat pipes.
7. Push pipe completely into socket of fitting, turning as it goes
until it bottoms.
8. Hold pipe and fitting together for 30 seconds. Then carefully
clean off excess with a cloth. Allow connections a sufficient
time to cure before disturbing.
9. Remember that vent pipes must be adequately and securely
supported.
APPROXIMATE SETTING TIME FOR I'A" TO 4"
JOINTS
PIPE
MOVEMENT
COMPLETE
OF JOINT
SET
90-F to 150“F
y* hr.
8 hrs.
50“F to OCF
1 hr.
15 hrs.
0“F to 50“F
1K hr.
18 hrs.
17