Cementing pvc, abs or cpvc pipe and fittings, Installation instructions (cont’d) – Sears POWER MISER 153.335914 User Manual

Page 17

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions (cont’d)

VENTING SYSTEM EXAMPLE INSTALLATIONS

FOR ALL MODELS (cont’d)

2. Horizontal runs require a minimum /*" rise per foot.

3. A vertical run can be no more than 20',

4. The total vertical and horizontal run cannot exceed 35'.

CEMENTING PVC, ABS OR CPVC PIPE AND FITTINGS

Read and observe all safety information printed on primer,

cleaner, and cement containers.

DANGER

Primer,

cleaner,

and

cements

are

extremely

flunmable.

They are harmful or fatal if swallowed. The vapors are

harmful. They may irritate eyes and skin and can be
absorbed through the skin.

PRECAUTIONS

Always store primers, cleaner, and cements in cool, dry,
well ventilated places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well

ventilated

areas.

Wear

impervious

clothing

while

handling. Do not smoke, eat, or drink while handling.

Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,

do not induce vomiting, and cail a physician or poison
control center immediately. If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of
eye and skin contact, immediately flush with plenty of

water for 15 minutes and seek medical attention if irri­

tation persists. KEEP OUT OR REACH OF CHILDREN.

All primers, cleaners, and cements must meet all local codes and

applicable standards of the American Society For Testing
Materials Standards,

ing sure contents are liquid. Do not use if found to be lumpy or

ielTy-lil

Before using primers, cleaners, and cements, stir or shake, mak­
ing sure c(
jelly-like.

1. Cut pipe ends squarely removing all burrs and dirt.

2. Dry fit pipe and fittings to be connected for proper fit.

3. Clean pipe and fitting with a primer/cleaner.

4. Apply a thin coat of cement to fitting, avoiding puddling

inside.

5. Apply a liberal coat of cement to pipe leaving no voids.

6. QUICKLY assemble parts while cement is fluid! If you wait

too long, re-coat pipes.

7. Push pipe completely into socket of fitting, turning as it goes

until it bottoms.

8. Hold pipe and fitting together for 30 seconds. Then carefully

clean off excess with a cloth. Allow connections a sufficient
time to cure before disturbing.

9. Remember that vent pipes must be adequately and securely

supported.

APPROXIMATE SETTING TIME FOR I'A" TO 4"
JOINTS

PIPE

MOVEMENT

COMPLETE

OF JOINT

SET

90-F to 150“F

y* hr.

8 hrs.

50“F to OCF

1 hr.

15 hrs.

0“F to 50“F

1K hr.

18 hrs.

17

Advertising