Assembly guide – Bowflex Xtreme 2 SE User Manual
Page 23
Advertising

Bowflex Xtreme
®
2 SE Assembly Manual
19
Assembly Guide
Figure 19b - Detail
step 19b Cable and Pulley Routing –
Connect Cable End Stop Ball with Core
step 19c Cable and Pulley Routing –
Connect Rod Cables through Left (3) Floating
and Lat Tower Pulleys
19-4
Repeat with Left Rod Cable and (3) and (8)
Floating Pulleys, as shown in Figure 19c .
note:
Once the Cable End Stop Balls are attached,
hook each Rod Hook onto the Lat Pulley
Housing as shown in Figure 19d .
5
4
3
2
Figure 19d - Rod Hooks Storage on Lat Pulley
Housing
Figure 19c
Advertising