Dlp-e145 connect the pdu ground cables to the pdu – Cisco 15600 User Manual

Page 37

Advertising
background image

17-37

Cisco ONS 15600 Procedure Guide, R8.0

Chapter 17 DLPs E100 to E199

DLP- E145 Connect the PDU Ground Cables to the PDU

Activate/Revert—Check this box to activate the uploaded software (if the software is a later than the
installed version) or revert to the uploaded software (if the software is earlier than the installed
version) as soon as the software file is uploaded. If unchecked, the software is not activated or
reverted after the upload, allowing you to initiate the functions later from the node view
Maintenance > Software tabs.

Re-init Database—Check this box to send a new database to the node. (This is equivalent to the CTC
database restore operation.) If unchecked, the node database is not modified.

Confirm—Check this box if you want a warning message displayed before any operation is
performed. If unchecked, reinitialization does not display a warning message.

Search Path—Enter the path to the CISCO 15600 folder on the CD drive.

Step 6

Click Go.

Caution

Before continuing with the next step, verify that the database to upload is correct. You cannot reverse
the upload process after you click Yes.

Step 7

Review the information on the Confirm NE Re-Initialization dialog box, then click Yes to start the
reinitialization.

The reinitialization begins. After the software is downloaded and activated, and the database is uploaded
to the TSC cards, “Complete” appears in the status bar and the TSC cards will reboot. Wait a few minutes
for the reboot to complete.

Step 8

After the reboot is complete, log into the node using the

“DLP-E26 Log into CTC” task on page 16-33

.

Step 9

Complete the

“NTP-E22 Set Up Date, Time, and Contact Information” procedure on page 4-4

.

Step 10

Return to your originating procedure (NTP).

DLP-E145 Connect the PDU Ground Cables to the PDU

Step 1

Locate the PDU ground cables (

Figure 16-3 on page 16-8

). Remove the PDU safety cover on the right

side and install the free end of the green terminal closest to the rear of the rack. This terminal is labeled
“Frame Ground” in

Figure 17-5

.

Purpose

This task connects the preinstalled power distribution unit (PDU) ground
cables to the PDU.

Tools/Equipment

Screwdriver

7/16-inch socket

Torque wrench calibrated to inch-pounds

9/64-inch Allen wrench

Prerequisite Procedures None

Required/As Needed

Required

Onsite/Remote

Onsite

Security Level

None