Power and ground – ADLINK cExpress-BT2 User Manual
Page 25
 
cExpress-BT2
Page 25
Signal
Pin # Description
I/O
PU/PD
Comment
LID#
LID button. Low active signal used by the ACPI operating system for a LID 
switch. 
I OD 
3.3VSB 
PU 10k 
3.3VSB 
Emulated on GPIO 
(BIOS) 
SLEEP#
Sleep button. Low active signal used by the ACPI operating system to bring 
the system to sleep state or to wake it up again. 
I OD 
3.3VSB 
PU 10K 
3.3VSB 
Emulated on GPIO 
(BIOS) 
3.3.18. Power and Ground
Signal
Pin #
Description
I/O PU/PD
Comment
VCC_12V A104-A109
B104-B109
Primary power input: +12V nominal (wide range 5 ~ 20V).
All available VCC_12V pins on the connector(s) shall be used.
P
5~20
V
VCC_5V_SBY B84-B87
Standby power input: +5.0V nominal. See section 7 “Electrical 
Specifications“ for allowable input range. If VCC5_SBY is used, 
all available VCC_5V_SBY pins on the connector(s) shall be 
used. Only used for standby and suspend functions. May be left 
unconnected if these functions are not used in the system design. 
P
5Vsb
±5%
VCC_RTC
A47
Real-time clock circuit-power input. Nominally +3.0V.
P
GND
A1, A11, A21, A31, A41, A51, 
A57, A66, A80, A90, A96, A100, 
A110, B1, B11, B21,B31, B41, 
B51, B60, B70, B80, B90, B100, 
B110 
Ground - DC power and signal and AC signal return path.
P