1.3 Underground Conduit Requirements

1.4 Pad Mount

The conduit requirements are for a typical swing gate operator installation (the secondary operator is shown for

those applications where a secondary operator may be used). The conduit requirements for your application may
vary from this depending on your specific needs.

Use only sweeps for conduit bends. Do not use 90° connectors as this will make wire pulls very difficult and can

cause damage to wire insulation.

We suggest that minimum 3/4-inch conduit be used to protect wires from the elements.

Be sure that all conduits are installed in accordance with local codes.

Low Voltage Control and/or P.A.M.S. Wires

Primary/Secondary Interconnection Cable (Dual Operator Application Only)

Low Voltage Loop Lead-In Wires

High Voltage Power

Sweeps

Concrete Pad

3/4 Inch Minimum

Primary

Operator

Position

Secondary

Operator

Position

22”

24”

25”

90°

Depth of the concrete pad is
determined by soil conditions and
local building codes. Reinforced
concrete recommended.

Note: If allowed by local codes, the
top of the concrete pad can be flush
with ground level, which will allow
the gate bracket to be mounted
lower on the gate.

Arm

Rotation

Area

Gate Bracket Height

Concrete Pad Position

3/8

Secure the operator to the
concrete pad with four (4)
3/8” x 3” sleeve anchors
(not supplied).

Never run high voltage and low voltage wires in the same conduit.

Note: 2” thick gate Illustrated.

Closed Gate

Open Gate

3”

3”

2.5”

2.5”

Right Support Leg

Left Support Leg

3”

Operator MUST
be level.

Note: Right support leg removed from
this illustration to show conduit detail.

Low
Volt

High
Volt

Inter

connection

Cable

These measurements will work for standard or
convenience open models from 1.1 layout on page 10 ONLY.

9.5”

Conduit

Advertising
This manual is related to the following products: