Programming an acquisition – EXFO PM-1100 Optical Power Meter User Manual

Page 33

Advertising
background image

Operating the Optical Power Meter

Optical Power Meter

23

Programming an Acquisition

Programming an Acquisition

You can program the PM-1100 to automatically acquire absolute or
referenced measurements. The following program parameters may be set:

³

delay: the beginning of the program may be delayed by up to
999 hours, 59 minutes, and 59 seconds;

³

duration: the program can last up to 999 hours, 59 minutes, and
59 seconds;

³

number of samples: up to 1024 samples can be taken (depending on
the selected duration).

Advertising