14 replacement of parts – Glow-worm Compact 100E User Manual

Page 37

Advertising
background image

37

221894A

14.20 Hydro Block Assembly Left hand side
(see diagram 14.18)

Before starting refer to Section 11.

Remove the two screws securing the controls cover door and
controls fascia, see diagram 9.1.

Hinge the assembly open.

Remove the heat exchanger, refer to Section 14.26.

Remove the diverter switch, refer to Section 14.13.

Remove low water pressure switch, refer to section 14.11.

Disconnect the pressure differential micro switch inline electrical
connector, refer to Section 14.18.

Unplug gas control valve multi pin connector.

Remove securing pins 1,2 and 3, see diagram 14.18.

Remove the plate to plate heat exchanger, refer to Section14.23.

Remove the bypass tube refer to Section 14.22

Remove the left hand side of the hydro block.

14.21 Hydro Block Assembly Right hand side
(see diagram 14.18)

Before starting refer to Section 11.

Remove the two screws securing the controls cover door and
controls fascia, see diagram 9.1.

Hinge the assembly open.

Remove the heat exchanger, refer to Section 14.26.

Remove the diverter switch, refer to Section 14.13.

Disconnect the domestic hot water micro switch inline electrical
connector, refer to Section 14.19.

Unplug gas control valve multi pin connector.

Remove securing pins 4,5 and 6, see diagram 14.18.

ELECTRICAL
PLUG

7019a

PRESSURE
DIFFERENTIAL
MICRO SWITCH

Diagram 14.18

HYDRO BLOCK
ASSEMBLY

DIVERTER
SWITCH

SECURING
PIN 1

14 Replacement of Parts

SECURING
PIN 6

SECURING
PIN 4 and 5

SECURING PIN
2 and 3

DOMESTIC
HOT WATER
MICRO SWITCH

LOW WATER
PRESSURE SWITCH

DOMESTIC HOT
WATER THERMISTOR

PUMP

FILTER

7077

PLUG

GAS CONTROL
VALVE MULTI PIN
CONNECTOR

Remove the plate to plate heat exchanger, refer to Section
14.23.

Remove the bypass tube refer to Section 14.22.

Remove the right hand side of the hydro block.

See inset on diagram 14.18 to remove heating return filter.

14.22 Bypass Tube/Valve

Remove the diverter switch, refer to Section14.13.

Remove the plate to plate heat exchanger, refer to section
14.23.

Remove the bypass tube by removing the two securing pins,
see Diagram 14.19.

Remove the bypass valve, see diagram 14.20.

14.23 Plate to Plate Heat Exchanger

Before starting refer to Section 11.

Remove the two screws securing the controls cover door and
controls fascia, see diagram 9.1.

Hinge the assembly open.

Remove the securing screws to release the plate to plate heat
exchanger, see diagram 14.21.

Remove the diverter switch, refer to Section14.22.

Push it out, tilt and remove, see diagram 14.21.

When re-fitting it will only fit one way.

14.24 Expansion Vessel

Before starting refer to Section 11.

Renewal of the expansion vessel requires the boiler to be
removed from the wall. As an alternative, a separate expansion
vessel of the same specification may be connected as close as
possible to the boiler, leaving the original in position, refer to the
Installation Instructions.

Disconnect the boiler water connection union nuts at the front
of the isolating valves, see 6.1.

LEFT
HAND

RIGHT
HAND

RETAINING CLIP

Advertising