7 Flue Installation

7.1 Rear Flue

Mark and cut the air duct terminal assembly, see diagram 7.3
and the flue duct, diagram 7.4 to the lengths required, cutting
square and removing any burrs.

Refer to diagram 7.5, mark through the holes in the flue elbow
assembly and drill the duct as shown, making sure of the correct
alignment of the “Top”.

7.2 Side Flue

Mark and cut the air duct terminal assembly, see diagram 7.6
and flue duct, diagram 7.7 to the lengths required, cutting
square and removing any burrs.

Refer to diagram 7.5 mark through the holes in the flue elbow
assembly and drill the flue duct as shown, making sure of the
correct alignment of the “Top”.

7.3 Internal Flue Assembly

If access to the outside wall is not practical, the flue system can
be installed from inside. Use of the optional wall liner kit
recommended.

Apply sealant to the flue duct, locate into the air duct terminal,
see diagram 7.8.

Apply sealant to the flue elbow spigot and then locate the flue
and air duct terminal assembly to the flue elbow as shown in
diagram 7.5, making sure of the alignment of the “Top”.

Secure the air duct/terminal assembly to the flue elbow and flue
duct assembly with the two self tapping screws supplied in the
loose items pack and then seal with the tape provided.

Place the flue assembly into the flue hole.

Make sure that the flue terminal is correctly positioned and
projecting the correct distance from the outside wall face, see
diagram 7.11.

Diagram 7.1

4368 S

TRANSIT BRACKET

LABEL

SECURING
SCREWS
(2)

Diagram 7.3

4045 S

STANDARD
FLUE TERMINAL

LONG FLUE
TERMINAL

"Q" plus 67mm

"Q"

Diagram 7.2

FAN
BRACKET

4444

FAN BRACKET
SECURING SCREW (2)

FAN SECURING
SCREW (3)