Martin Christ Beta 2-8 LSCplus User Manual

Page 95

Advertising
background image

Beta 1-8 LSC&

Beta 2-8 LSC&

11 Appendix

Version 04/2013, Rev. 1.1 of 16/12/2013 • sb

95

Translation of the original operating manual

11 Start the main drying process either by opening the manual shut-off

valve or by waiting for the electromagnetic valve to open. Vacuum is
applied to the chamber and the freeze-drying process commences.

NOTE

The vacuum pump always runs with maximum power. With this type of
freeze-dryer, the power of the vacuum pump cannot be controlled.


12 The operating panel displays the vacuum, the ice condenser

temperature, and the current operating mode.

13 The end of the process is reached when the ice condenser is no longer

loaded and when it again reaches a final temperature of approximately -
50°C to -54°C. The pressure decreases as a function of the ice
condenser temperature.

14 Switch the vacuum pump off and aerate the drying chamber via the

condensate drain valve or via a rubber valve.

15 Switch the unit off by actuating the mains power switch and take the

product out of the freeze-dryer.

16 Switch the unit on again and start the defrosting process (button

"Operating mode: select/start" – "Defrosting”).

CAUTION

Ensure that no water gets into the pipe connection of the vacuum pump or
vacuum sensor.


17 Drain the defrosting water via the condensate drain valve on the left-

hand side of the unit. To do so, connect a hose to the hose connector
and collect the defrosting water in a suitable vessel.

18 Keep the freeze-dryer open (i.e. without the lid or drying chamber) when

it is not in use so that moisture can evaporate. This increases the
service life of the vacuum sensor.



Step-by-step instructions – drying in a flask
1 Freeze the sample separately, e.g. in a deep-freeze.

NOTE

Ensure that the layer thickness of 1 to 2 cm is not exceeded, since
otherwise the drying time needs to be extended.


2 Check the ice condenser chamber and ensure that is completely free

from water residues.

3 Install the drying chamber. Prior to doing so, check whether the O-ring

is completely free of dirt particles. The ground-in stopper of the acrylic
glass bell must be greased with high-vacuum grease.

Advertising
This manual is related to the following products: