Priority 24 – TFC Group Talento 894 User Manual

Page 23

Advertising
background image

10. Priority

24

Switching commands with the data assignment can be occupied with
different priorities (block number 00 and priority 0 is defined for
switching commands without date assignment).

If you start with a date during programming, a new block number and
priority 2 are always offered = default for a single date.
If a date range is entered – with the key –, priority 1 is automatically
assigned. The priority can be changed between 1 and 9. The switching
command with the higher priority is executed first.

Example: Within a date range, e. g. 9.6 to 30.6 (priority 3),

it is possible to assign priority 4 or higher to a single day,
e. g. 22.6, but only in separate blocks.

Press the Prior. key step-wise.
The numbers change:
2 – 3 – 4 – … – 9 – 1 – 2 – …
etc.
1 – 2 – 3 – 4 – … – 9 – 1 – 2 – …

09.06 bis 30.06
etc.

Blank line

Switching commands
Switching commands
……………
Pulse switching commands
Cycle switching commands
etc.

Block 01

Priority 3

22.06
etc.

Blank line

Switching commands
Switching commands
……………
Pulse switching commands
Cycle switching commands
etc.

Block 02

Priority 4

Advertising
This manual is related to the following products: