Installation, General installation guidelines, 1 dimensions – Pilz PDP67 F 8DI ION User Manual
Page 15: 5installation, 1 general installation guidelines
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
5-1
5.1
General installation guidelines
5
Installation
55000
Installation
Installation
5-
5.1
General installation guidelines
5100
General installation guidelines
5-
Montagefläche_PDP
The product must be fastened to a flat mounting surface, so that there
is no strain on the housing when the module is screwed down. The
mounting distances will depend on which plug-in connectors are used
and on the bending radius of the cables.
Unused connectors should be sealed using blind plugs.
Montage_PDP - Vorgehensweise
To install the system, proceed as follows:
Fit 2 x M4 internal threads on the mounting surface.
Use two fixing screws to attach the product to the mounting plate.
Montage_PDP - Vorgehensweise_Funktionserde an Schraube
With shielded cables, connect the functional earth to the upper fixing
screw X0.
5.1.1
Dimensions
Dimensions
5-
Abmessungen_PDP67_8DI ION
60
4,5
123
133
4,5
29,6 5,6
22,1