3 installation and connection, Installation and connection, Installation and connection in a headend base unit – AXING SKQ 2-01 User Manual

Page 6: 3installation and connection

Advertising
background image

Installation and connection

SKQ 2-01

© AXING AG – state of the art: July 2012 – Reserving change in design and type

Page 6

3

Installation and connection

The SKQ 2-01 can either be operated in a head ends basic unit SKS x-xx or in stand alone mode. SAT
ZF signals of the LNB(s) are either provided through optionally available input distributors, a multiswitch
or directly to SAT ZF inputs.

3.1 Installation and connection in a headend base unit

If you want to operate the SKQ 2-01 on a head ends basic unit SKS x-xx, plug the twin module into the
output collection field 1 and fasten it by screws. Each free slot may be used. The power supply unit SKZ
5-00 or SKZ 6-00 supplies the module via the output connection field.

For detailed information on the headend base unit, refer to whose operating instructions.

Before inserting or changing a module, pull the mains plug of the head ends basic unit from the socket!
To avoid dangerous overvoltages, (attention: risk of fire/death), the base plate must be grounded
according to EN 50083-1, EN 60728-11:2010.

Fig. 3

Installation and connection in a head ends basic unit

1

base plate without modules

base plate fully equipped

Advertising