4 showvault server installation – Doremi ShowVault / IMB User Manual
Page 10
Advertising

CRT.OM.001420.DRM
Page 10 Version1.6
Doremi Labs
4 ShowVault Server Installation
Follow the steps below to configure the ShowVault server with the Christie Series-2 projector:
Connect one end of the Ethernet cable into the ShowVault "Eth0" socket and the other
end into the Christie projector (Figure 5).
Figure 5: Ethernet Cable Connection
Connect one end of the PCI-Express cable into the ShowVault and the other end into the
IMB board on the Christie projector (Figure 6).
Figure 6: PCI-Express Cable Connection
Advertising