Doremi ShowVault / IMB User Manual

Page 14

Advertising
background image

CRT.OM.001514.DRM

Page 14 Version1.7

Doremi Labs

Connect both power cords into the ShowVault as illustrated below:

Figure 14: ShowVault Power Cables

Plug the power cable of the Series 2 projector into a reliable power source.

Power ON the Series 2 Projector by pressing on its power/Lamp switches.

Figure 15: NEC Projector Power/Lamp Switches

Advertising