Paxton Superchargers Carbureted Mustang Novi 2000 User Manual

Page 30

Advertising
background image

6-2

P/N: 4PFX020-020

©2006 Paxton Automotive

All Rights Reserved, Intl. Copr. Secured

24APR06 v1.1 MusGT(4PFX..020 v1.1)

Fig. 6-g

Fig. 6-h

G.

Connect the supplied length of 5/8" hose to
the previously installed 5/8" 90° fitting on
the cast elbow. Trim for best fit and attach to
the stock fitting on the valve cover. (See
Fig. 6-g.)

J.

Connect a piece of the supplied vacuum line
to the top of the by-pass valve. Route the
line to the rear of the carburetor enclosure
and attach to the vacuum fitting previously
installed.

H.

Connect the factory 3/8" hose with the
check valve (previously connected to factory
carburetor) to the 3/8" 90° fitting installed in
the cast inlet elbow. Route the A/C line
down under the 1" port on the cast inlet
elbow. (See Fig. 6-h.)

I.

Attach a piece of the supplied 1"ID rubber
hose approximately 9.5" long to the 1" port
on the cast elbow and secure using a #16
hose clamp. Connect the by-pass valve to
the open end of hose and secure with a #16
hose clamp. Attach a piece of 1"ID rubber
hose approximately 2" long to the open end
of the by-pass valve and secure using a #16
hose clamp. (See Fig. 6-h.)

1" x 9.5"

RUBBER HOSE

A/C LINE

FACTORY 3/8" LINE

WITH CHECK VALVE

BYPASS VALVE

SUPPLIED

5/8" HOSE

VACUUM LINE

CONNECTION

LOWER REAR

1" x 2" RUBBER HOSE

Advertising