Indicator lights: startup sequence, Wiring problems – ARRIS TM722G-CT User Guide User Manual

Page 58

Advertising
background image

Indicator Lights: Startup Sequence
The following table shows the Telephony Modem light patterns during each phase

of the startup sequence. There are two phases of startup; the Telephony phase and

the cable modem phase. Both are outlined below.

Note:

The DS and US indicators flash yellow during startup, and turn green if

the Telephony Modem establishes an ultra-high speed connection. The

Link indicator may be yellow or green, as determined by the table on the

previous page.

Power, DS,

US, Online

Link

Telephone

Description

1

2

Off

Off

Off

Off

No power to Cable Modem

Flash

Flash

Flash

Flash

Power-on Self Test

See “Cable Modem Start Up Sequence” Below

On

On

Flash

Off

Retrieving telephone network in-

formation

On

On

Off

Flash

Retrieving telephone line informa-

tion

On

On

Flash

Flash

Activating telephone service

Normal Operation

Touchstone TM722 Telephony Modem User’s Guide

Safety

Getting

Started

Battery

Installation

Installation

USB

Drivers

Ethernet

Configuration

Usage

Troubleshooting

Glossary

58

Advertising
This manual is related to the following products: