Installing – Desa FPVF33PR User Manual

Page 14

Advertising
background image

14

103280

Figure 14 - Attaching Fireplace to Wall Studs

Nailing Flanges

Nails or Wood
Screws

INSTALLING

Continued

39 3/8"

27 7/8"

55 5/8"

35 1/2"

Figure 13 - Rough Opening for Installing in Corner

If installing in a corner, use dimensions shown in Figure 13 for the rough opening.
The height is 33" which is the same as the wall opening above.

2. Install a properly grounded, three-prong 120 volt electrical outlet at fireplace

location. Locate outlet inside the framed enclosure.

3. Install gas piping to fireplace location. This installation includes an approved

flexible gas line (if allowed by local codes) after the manual shutoff valve. The
flexible gas line must be the last item installed on the gas piping. See Installing
Gas Piping to Fireplace Location,
page 16.

4. Carefully set fireplace in front of rough opening with back of fireplace inside

wall opening.

5. Attach flexible gas line to fireplace gas regulator. See Connecting Fireplace to

Gas Supply, page 17.

6. Route blower electrical cord through side or rear access door of fireplace. Plug

electrical cord into electrical outlet.

7. Carefully insert fireplace into rough opening.
8. Attach fireplace to wall studs using nails or wood screws through holes in

nailing flange (see Figure 14).

9. Check all gas connections for leaks. See Checking Gas Connections, page 18.
10. Install brass trim after final finishing and/or painting of wall (see Figure 6,

page 10).