STEP 2: ATTACHING THE TWO WHEELS TO THE TANK ASSEMBLY WHEEL SPINDLES.

1. Block the reservoir assembly up off the ground and insert a wheel assembly (4) onto the axle (valve stem facing out) (Figure 3).
2. Install a castle nut (5-1) as snug as you can by hand.

3. If the hole in the axle doesn’t align with the slots in the castle nut, turn the nut with a wrench only enough so the hole and slot

align.

4. Secure the nut to the axle with a cotter pin (5-2). Bend the ends of the cotter pin with pliers.

5. Install the hub cap (5-3) onto the wheel using a soft faced hammer.

STEP 3: ATTACHING THE TONGUE AND JACK STAND ASSEMBLY TO THE RESERVOIR ASSEMBLY.

1. Remove the spring clip (Ø3) and clevis pin (Ø6 x 50) from the jack stand on the tongue (Figure 4).
2. Pivot the jack stand towards the ground into the operating position.

3. Secure the jack stand in position with the clevis pin and spring clip.

REF. NO.

DECSRIPTION

QTY.

4

................

Road-Speed Tire and Wheel

...............

2

5

................

Hardware Kit #2 (not shown)

............

1

Including:

5-1

..............

Castle nut / 1-14

..............................

2

5-2

..............

Cotter Pin / Ø4 x 35

.........................

2

5-3

..............

Hub cap

.........................................

2

(Figure 3)

Clevis Pin

Spring Clip

Jack Stand

(Figure 4)