DR Power 22-Ton (July 2013 - Present) User Manual

Page 17

Advertising
background image

CONTACT US AT www.DRpower.com 17

STEP 9: ASSEMBLING THE CONTROL HANDLE.

Note: The control handle is shipped hanging from the valve on the handle link

1. Remove the clevis pin and bow-tie cotter pin from the control handle (Figure 11).
2. Rotate the control handle up into the operating position and secure with the clevis pin and bow-tie cotter pin.

(Figure 11)

Advertising
This manual is related to the following products: