DR Power 22-Ton (July 2013 - Present) User Manual

Page 9

Advertising
background image

CONTACT US AT www.DRpower.com 9

Due to the weight / size of the log splitter, it’s recommended that two or more adults be present to assist with the assembling.

STEP 1: ASSEMBLING THE FENDERS TO THE RESERVOIR ASSEMBLY.

1. Loosely assemble the top of the fender (2) to the fender support (3-1) with a bolt (3-2), flat washer (3-3) and locknut (3-4)

using two 13mm wrenches (Figure 2).

2. Secure a fender (2) and fender support (3-1) to the reservoir assembly with three bolts (3-2), six flat washers (3-3) and

three locknuts (3-4) using two 13mm wrenches.

3. Finish tightening the hardware to secure the top of the fender to the fender support.

(Figure 2)

REF. NO.

DECSRIPTION

QTY.

1

.................

Reservoir tank assembly

....................

1

2

.................

Fender

...........................................

2

3

.................

Hardware kit #1(not shown)

..............

1

Including:

3-1

..............

Fender support

................................

2

3-2

..............

Hex head bolt / M8 x 25

....................

8

3-3

..............

Flat washer / M8

..............................

16

3-4

..............

Lock nut / M8

.................................

8

Advertising
This manual is related to the following products: