Installing the tires and front leg – DR Power Hydraulic 8-Ton User Manual
Page 14
14
8-TON DR
®
WOOD SPLITTER
Installing the Tires and Front Leg
1. Raise one side of the Wood Splitter and slide two
Large Washers over the Axle then install a Tire onto
the axle (Figure 11).
2. Install a Push-on Nut and tap it in place (hammer)
(Figure 12). Repeat the process for the other wheel.
NOTE: Placing a socket over the push nut and tapping on the socket
will make it easier to install the push nut.
3. Unfold the Front Handle from under the Rail (Figure
13).
4. Attach the Front Leg to the Rail using two 5/16" x 1"
Hex Bolts and Locknuts. One Bolt/Locknut is in the
parts box; the other you already removed from the Rail
and the Shipping Bracket.
Your 8-Ton DR Wood Splitter is now fully assembled.
2 Large
Washers
Figure 11
Axle
Figure 12
Tire
Push-on
Nut
Front
Leg
Figure 13
Front
Handle
Bolts and
Locknuts
Rail