Unpacking the crate – DR Power Hydraulic 22-Ton User Manual

Page 13

Advertising
background image

Contact us at www.DRpower.com 13

Unpacking the Crate

1. Cut the metal banding and remove the protective

plastic covering, top, sides and ends, of the packing
crate (Figure 2). Do not remove the base unit or the
rail assembly from the bottom pallet at this time.

2. Locate and check the condition of the larger

components on the shipping pallet (Figure 3). If you
have any questions, call DR Power Equipment at 1
(800)

376-9637.

3. Cut the remaining banding straps, open the cardboard

box, and make sure all the smaller parts have been
shipped. The chart in the “Shipping List” section
provides a complete list of all the parts shipped with
your wood splitter. If you have any questions, call DR
Power Equipment at 1 (800)

376-9637.

NOTE: The contents of the cardboard box (Figure 4) contains

the tow hitch assembly, two safety chains and safety
link, two fenders, valve handle assembly, hydraulic
fluid filter, and rail rest assembly.

Also, included in the box is a plastic bag of miscellaneous

hardware and a plastic bag with the control valve
handle assembly.

Figure 3

Rail
Assembly

Base Unit

Banding
Straps

Cardboard
Box

Tongue and
Front Leg
Assembly

Figure 4

Fenders

Tow Hitch
Assembly

Safety
Chains

Control Valve
Handle Assembly

Hydraulic
Fluid Filter

Hardware

Rail Rest and
Locking Lever
Assembly

Figure 2

Packing
Crate

Metal Banding

Advertising