DR Power Hydraulic 22-Ton User Manual

Page 18

Advertising
background image

18

DR

®

22-TON VERTICAL/HORIZONTAL WOOD SPLITTER

15. Install the control valve handle onto the valve link

(Figure 16) using a 1/4 x 3/4 inch long clevis pin
(install clevis pin from the top). Secure the clevis pin
with a cotter pin (bend the ends of the cotter pin to

make it secure).

16. Attach the control valve handle to the valve spool

(Figure 17) using a 1/4 x 1 inch long clevis pin (install
clevis pin from the top). Secure the clevis pin with a
cotter pin (bend the ends of the cotter pin to make it
secure). Attach the knob to the control valve handle,
if necessary.

17. Attach the high-pressure hose from the filter assembly

to the fitting on the side of the valve (Figure 18).
Securely tighten the hose fitting with a 10-inch
crescent wrench.

NOTE: The high-pressure hose is self-sealing and does not require
any type of sealing material.

Figure 18

Valve
Fitting

High
Pressure
Hose Fitting

From Filter
Assembly

Figure 17

Control
Valve
Handle

Clevis
Pin

Cotter
Pin

Valve
Spool

Knob

Figure 16

Control
Valve Handle

Clevis
Pin

Cotter
Pin

Advertising