Installation, Two installation options – Geist RAC User Manual

Page 4

Advertising
background image

4

Revision Date: 09/03/2014

Installation


The RAC10 relies on the building installation for protection from overcurrent. A Listed
circuit breaker is required in the building installation. The circuit breaker should be rated at
15 or 20 Amps.

Install the RAC10 so the input plug may be disconnected for service.


Installation:

1. Using appropriate hardware, mount unit into wall or dropped ceiling as detail in Mounting

Requirements Section of Instruction Sheet.

2. Plug RAC10 into appropriately rated and protected branch circuit receptacle.


Service and Maintenance:

No service or maintenance is required. Do not attempt to open the RAC10 or you may void the
warranty. No serviceable parts inside.

Two Installation Options

Wall or ceiling mount for automated heat exhaust and critical monitoring / alerts. Optional System
for room air supply required for some room and load conditions






Advertising