Installation manual masterline ultimate hybrid – HUBER+SUHNER MASTERLINE Ultimate Hybrid User Manual

Page 7

Advertising
background image

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of

tools and accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product

warranty provided by HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these pro-

ducts. For advice concerning the general handling of these products please contact HUBER+SUHNER.

Step 15

Tighten cable gland to secure cable and ensure IP protection.

Step 16

Measure (twice) the required DC tail length and cut them.

Step 17

DO NOT CUT AT ANY STAGE THE FIBRE OPTIC ELEMENT.

Step 18

Route DC cable element to their respective termination points and

connect.

Route earth wire to earth bonding point and connect.

Step 19

If earthing is required outside cabinet/cabin use universal ground-

ing kit and follow separate instructions.

NOTE: the earthing cable can also come in black.

INSTALLATION MANUAL
MASTERLINE Ultimate Hybrid

Advertising