Securing Boards

In the event that it is necessary to field cut the

boards, 12” on center screw spacing should be

maintained. Construction adhesive should be

applied to each board.

Using an 1/8” bead, apply the adhesive around

the perimeter of the board approximately 1”

from the edge. Complete the adhesive cover-

age by applying an “X” from corner to corner.

*Take care to ensure that adhesive does not

come into contact with PEX tubing.

Floating Board Installation

InfloorBoard II™ may also be installed without

physically attaching it to the subfloor. This appli-

cation is typically used for installation over a

concrete slab or where subfloor penetrations

are not desired. A floating board installation is

not recommended for tile or stone finish floors.

Note: It is important in a floating board installa-

tion to stagger the seams between rows of

boards. This will provide for a more stable floor.

At the start of the second row, cut 8” off of the

first board. Continue to cut the first board on

every other row making sure that the surface

grooves line up with previous rows.

There are two methods for installing “floating”

boards. First, boards may be edge glued similar

to laminate flooring installation. Use a quality

construction adhesive and follow the manufac-

turer’s instructions. Wipe all excess adhesive

from the grooves and joints taking care to en-

sure that adhesive will not be in contact with the

PEX tubing. The second method is to apply a

plywood cover sheet overtop of a “dry” fit (not

edge glued) InfloorBoard II™ installation. After

the PEX tubing has been installed (see

Install

PEX Tubing), the cover sheet should be glued

and screwed to the boards. Apply construction

adhesive to the boards maintaining at least a 2”

clearance from all surface grooves. After gluing,

screw the cover sheet to the InfloorBoard II™

using 12” on center screw spacing.

InfloorBoard II™ Layout

It is best to utilize a floor plan to determine the

optimum board layout. Using a carpenters

square, determine if the room itself is square. If

necessary, snap a chalk line to follow. In gen-

eral, the first board should be placed in a far

exterior corner of the room so that the straight

runs of tubing will be parallel to the exterior wall

of highest heat loss. This and all other boards

should be maintained aprox. 3/8”” from the

walls

. *Place temporary 3/8” spacers be-

tween the wall and InfloorBoard II™. These

will be removed after installation is com-

plete. The two “tongue” edges should be facing

the two walls. This leaves the recessed “groove”

edges exposed towards the room. As you con-

tinue to place down the boards, the grooved

edges will now remain exposed for easier tap-

ping of the boards (using a rubber or other

Adhesive Layout

Supply

Return

Adhesive Layout

Advertising