Procedure, 1 practical use – Ivoclar Vivadent SR Ivocap Equipment System User Manual

Page 10

Advertising
background image

10

6.1 Practical use

6. Procedure

The most important steps:

Injection - 5 minutes

Polymerization – 35 minutes in
boiling water (as of the beginning
of boiling)

Cooling in a cold-water bath –
at least 30 minutes; the injection
pressure must be maintained for at
least 20 minutes thereof

3

2

1

Compressed air
6 bar

Water level

Pressure apparatus

Capsule

Flask

Mark for water level

Flowing cold water

For information on how to process the material please refer to the material Instructions
for Use of the SR Ivocap System.

Advertising