If it is not installed, proceed as follows:

•

Loosen both Allen screws (6) of the gear - they are secured
against loss. The gear can now be split into two sections.

•

Connect the sections of the gear on the lower delivery shaft
(7). Slightly tighten both Allen screws.

•

Connect the bridge.
Make sure that the cutouts of the
bridge are properly seated on the
pins (8) and the cross-bar (9).

•

Check that the drive gear meshes with the gear of the bridge.

•

Tighten both Allen screws (6).

•

Connect delivery A 35 to the cross-bar (9).

•

Adjust the height of the foot by turning the setting screws (10).

Operator's Manual

multipli 35

Fanned Delivery

46

Mathias Bäuerle GmbH

14. FANNED DELIVERY A 35

This type of delivery (order-no. 5.500.265) is equipped with an extended transport
belt. This feature increases the capacity so there is more time between removing paper.
The continuously adjustable drive permits a precise setting
of the fanned delivery by means of a potentiometer.

Components and operating elements:

1

Transport belt

2

Potentiometer for belt speed

3

Stacker plate

A transfer bridge (4) must be attached to the delivery
end of the fold unit when working with a delivery A 35.

Description

1

2

3

10

Installation

When the bridge is used for the first time, check
whether there is a drive gear (5) on the lower
delivery shaft.

4

6

6

7

8

9

5

Drive for standard delivery

7

Advertising