Normal operations – MEGA Corp. MTT-OPS-1 User Manual

Page 34

Advertising
background image

MTT-OPS-1

13 Nov 2013

SECTION 4

Normal Operations

4-7

6. Cab Control SYSTEM/POWER Switch – ON

7. MONITOR/BFV Switch – ON

8. DUMP BAR Switch – ON

9. DRAIN Switch – ON

10. Water Cannon Nozzle – Pointed fully DOWN

11. Cab Control SYSTEM/POWER Switch – OFF

12. Turn engine off.

13. Hose Reel – DRAIN

a. Hose – UNWIND
b. Nozzle – Fully OPEN
c. Gate Valve – OPEN
d. Allow water to drain.
e. Hose – REWIND
f.

Gate Valve – CLOSED

g. NOZZLE – CLOSED

14. Check to ensure all water has drained from tank.

TO REACTIVATE UNIT:
1. Lubricate water pump bearings as instructed in -2

technical manual.

2. Inspect tank interior to ensure it is clean, if the

tank is coated, ensure coating integrity, clean or
repair as required.

3. Install sump cover with new gasket.

4. Close all drain valves and petcocks.

5. Start engine.

6. Control SYSTEM/POWER Switch – ON

7. Individual Spray Head Switches – OFF

8. DUMP BAR Switch – OFF

9. DRAIN Switch – OFF

10. MONITOR/BFV Switch – OFF

11. Cab Control SYSTEM/POWER Switch – OFF

12. Turn engine off.

Advertising
This manual is related to the following products: