Unpacking welder, Packing list, Work area – Dukane Dual Servo Spin Welder 403570-01 User Manual

Page 21

Advertising
background image

Dukane Manual Part No. 403-570-01

Page 15

Section 3 - Unpacking and Setup

Qty

Item

Part Number

1

Dual Servo Spin Welder

SVT012VR or
SVT032VR or
SVT042VR

1

Base Interface Cable

200-1124-3 or
200-1545-01

1

Dual Servo Spin Welder
Manual

403-570-XX

1

CD with Dual Servo Spin
Welder Utility

___

Unpacking Welder

The Dual Servo Spin Welder is normally packed in a
corrugated carton resting on a wooden shipping pallet.
To unpack the welder follow these steps.

1. Remove the straps from the carton.

2. Open the top of the carton. Carefully remove any

packing materials, cables and documentation.

3. Cut the tape at the bottom corners and unfold the

flaps.

4. Remove the corrugated carton, but leave the welder

on the pallet.

5. Leave the power cable wrapped up until after the

welder has been placed in its working area and you
are ready to begin hooking up power. This will pre-
vent accidental kinking or pinching of the power
cable.

Packing List

After removing the shipping container, check that you
have the items listed in Table 3-I. Inspect the welder for
damage. Report any damage immediately to the carrier
and to Dukane Ultrasonics Service at (630) 762–4900.
Also see Section 11 for information on contacting
Dukane. Save all shipping and packing materials so
they can be inspected in processing any claims that may
arise

.

Work Area

Allow sufficient area on either side of the Dual Servo
Spin Welder for handling material, work pieces and
fixtures. Provide ample room so that the movement of
an operator or helper does not interfere with the work of
another. Also be aware that under extreme conditions,
small droplets of molten plastic may be spun off from
the upper part.

Table 3-I

Dual Servo Spin Welder Packing List

Advertising