Replacing components – Nortec SynPur User Manual

Page 29

Advertising
background image

Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009

page 29 of 37



CO

2

Bottle:


The bottle must be secured against falling over. Check
whether everything is correct and save.

Inspection of the bottle pressure. The bottle pressure and the
outlet pressure can be inspected on the bottle pressure
reducer. The outlet pressure should be between 6 and 6.5 bar
(87-95psi). If the pressure is too low please try to adjust the
pressure to the needed value. If this is not possible, it could be
that the pressure reducer is broken or the gas bottle is empty.

Cycle:

Every 2 weeks

6. Replacing components


Please notify NORTEC Service if you find a fault in the system.

If there is a question please call +1 613 822 0335.

Only qualified and trained personnel should perform the replacement. The
Operator is responsible for ensuring that the personnel are qualified and trained
and that the work is performed in accordance with the specifications from
NORTEC, in particular with the specifications contained in this document.

ATTENTION:

-

Inform everyone in the area that work is to be performed on the SynPur.


-

Secure the system against accidental startup.

-

Notify everyone in the area that during this time the air humidification
system will not be operating.

Advertising