2 synthesizer cartridge – Nortec SynPur User Manual

Page 32

Advertising
background image

Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009

page 32 of 37

6.2 Synthesizer cartridge


bar

ba

r

ba

r

bar

1

1

3

2

4

IN

OUT

Patentierte
Reinraum-Befeuchtung

Prozessorgesteuerte
Demineralisierung

Automati sierte
Hygienefunktionen

Modem-
Schnittstelle

Ausbeute 100%

Anbindung
Gebäudetechni k

Ein/Aus

Produkt

Gas

Synthese-

wasser

Synthese-

patrone

Reinwasser

Figure 19: Replacing the synthesizer stage

-

Close the shutoff valves (1) on the mounting rail.


-

Turn off the mains switch (2) of the SynPur.

-

Open the shutoff valves (3). Wait until the system is completely depressurized.
The pressure is indicated on the pressure gage.

-

Remove the lines (4) on the synthesizer cartridge.

-

Connect the new synthesizer cartridge in reverse order.


ATTENTION:
When exchanging the synthesizer cartridges, ensure that the inputs
and outputs are connected as described in Section 3.3.

ATTENTION: After the system has been restarted it should be checked for leak-
tightness. Inspect the system occasionally over the next two days.

The Operator should send the exchanged synthesizer cartridge to NORTEC for
regeneration:

Advertising