Nortec links 2 start-up checklist – Nortec LINKS 2 GSTC User Manual

Page 30

Advertising
background image

26 | Installation

NORTEC Links 2 Start-up Checklist

Wiring

Humidifier-to-Humidifier Connection:

Each individual humidifier linked to lead unit.

Connection must be daisy-chained from the lead unit to the end unit, with shield wire

connected only on the lead unit.

Check that each humidifier has a unique modbus address.



BMS Network Connection:

Lead unit wired to BMS system (Twisted Pair or Ethernet).

Network activity verified.

Shields should be connected at BMS end only.



Controls Wired:

Directly to humidifiers or through BMS network.

Start-up Procedure

Ensure power is being supplied to the humidifier, NORTEC Links Module and NORTEC

OnLine module. For BACnet/IP adjust network IP settings. (If this information is provided,

factory will perform necessary IP assignment).

After power-up, verify network communication.

Map desired network variables to BMS.

Verify variable operation after mapping is complete.

Perform regular humidifier start-up check.

Firewall

Network port 5222 should be open to TCP traffic for NORTEC OnLine operation (when

used).