Step 1 – mounting the links 2 assembly – Nortec LINKS 2 SETC B+ User Manual

Page 15

Advertising
background image

11 | Links 2 Retrofit for GSTC / SETC B+, NHTC, NHRS

Links 2 – Field Retrofit for NHRS Models
(BACNET, LONWORKS, and N2 Modules)

Figure 13: Component Identification

Step 1 – Mounting the Links 2 Assembly

1 The Nortec Links 2 assembly mounts on the top, right corner of the electrical compartment.
2 Ensure that the rear, upwards facing hook engages the proper cooling louver at the back of

the humidifier cabinet.

a

Fasten the bracket assembly to the humidifier ‘top’ using the 3 8-32 X ½” self-tapping
screws provided with the kit.

Figure 14: Hook Position

LAN Router or

Switch

OnLine

Module

Links 2
Module

Router Power
Supply

Hook
Position

Advertising
This manual is related to the following products: