IMPORTANT:

Hold the pressure regulator with

wrench when connecting it to gas piping and/or

fittings. Do not over tighten pipe connection to

regulator. The regulator body could be damaged.

CAUTION: Use only new, black

iron or steel pipe. Internally-tinned

copper tubing may be used in cer-

tain areas. Check your local codes.

Use pipe of large enough diameter

to allow proper gas volume to

heater. If pipe is too small, undue

loss of volume will occur.

Typical Inlet Pipe Diameters

VN20BT, VP20BT - 3/8" or greater
VN30BT, VP30BT - 1/2" or greater

Installation must include equipment shutoff valve,

union and plugged 1/8" NPT tap. Locate NPT tap

within reach for test gauge hook up. NPT tap must

be upstream from heater (see Figure 15).
IMPORTANT:

Install an equipment shutoff valve

in an accessible location. The equipment shutoff

valve is for turning on or shutting off the gas to

the appliance.
Apply pipe joint sealant lightly to male NPT

threads. This will prevent excess sealant from

going into pipe. Excess sealant in pipe could result

in clogged heater valves.

WARNING: Use pipe joint

sealant that is resistant to liquid

petroleum (LP) gas.

Install sediment trap in supply line as shown in

Figure 15. Locate sediment trap where it is within

reach for cleaning. Locate sediment trap where

trapped matter is not likely to freeze. A sediment

trap traps moisture and contaminants. This keeps

them from going into heater controls. If sediment

trap is not installed or is installed wrong, heater

may not run properly.

Figure 14 - External Regulator With Vent

Pointing Down

External
Regulator

Propane/LP
Supply Tank

Vent
Pointing
Down

INSTALLATION

Continued

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessories, page 21.

Figure 15 - Gas Connection

Pressure
Regulator

Tee Joint
Reducer
Bushing
to 1/8"
NPT
1/8" NPT
Plug Tap

Tee Joint
Pipe
Nipple
Cap

3/8" NPT
Pipe Nipple

Heater Cabinet

Sediment

T

rap

Equipment
Shutoff
Valve *

3" Min.

Natural Gas
From Gas Meter
(4" W.C. to 10.5"
W.C. Pressure)
Propane/LP
From External
Regulator
(11" W.C. to 14"
W.C. Pressure)

Ground Joint
Union

Note: Burner
bracket not
shown for clarity

Test Gauge Connection*

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an

open flame to check for a leak.

Apply a noncorrosive leak detec-

tion fluid to all joints. Bubbles

forming show a leak. Correct all

leaks at once.