Remko heat pump manager – REMKO Multi-talent Plus User Manual

Page 32

Advertising
background image

REMKO Heat Pump Manager

Designation

Value range

Factory setting

Description

WE Dyn up

20-500

350

Setting the value for the connection of all WE-levels
(WE-connection dynamic [K]).

If the cumulative system deviation in Kelvin reaches the
value set here, this effects the connection of all
WE-levels (the smaller the value, the faster the connection).

Values that are too small can lead to overheating or to a
short-term connection of a WE.

WE Dyn down

20-500

20

Setting the value for the shut-off of all WEs
(WE-shut-off dynamic).

If the cumulative system deviation in Kelvin reaches the
value set here, this effects the shut-off of all WEs (the
smaller the value, the faster the shut-off).

Values that are too large can lead to overheating and
triggering of the STB.

Reset time

05-500

30

Setting of the reset time for the I-controller.

Small values lead to fast controller response and can lead to
vibrations.

Adjusting this value can lead to overshooting the controller.

Modgrad on

0 %-100 %

100 %

Setting the modulation depth at which the next WE in the
sequence should be connected.

The connection can take place at the end of the remaining
idle time.

Modgrad off

0 %-100 %

80 %

Setting the modulation depth at which the last WE in the
current sequence should be shut off.

Min modgrad

0 %-100 %

00 %

Setting the modulation depth at which the next WE should
be connected.

The connection of the next WE only takes place if the result-
ing modulation depth for the individual WE following con-
nection exceeds the value set here.

For operation with the maximum number of burners,
Modgrad On must be set to "00%" and Min. Modgrad
must be set to the minimum modulation depth for the WE-
levels.

Modgrad WW

40 %-100 %

100 %

Setting the target modulation depth for the heating appli-
ances in hot water mode.

WE sequence 1

1-2-3-4-5-6-7-8

1-3-2

-4-5-6-7-8

Setting the sequence in which the heating appliances go into
operation at sequence 1.

WE sequence 2

1-2-3-4-5-6-7-8

3-1-2

-4-5-6-7-8

Setting the sequence in which the heating appliances go
into operation at sequence 2 (for two stage WEs, the second
stage is always switched after the first stage).

Cascade - continued

Level 4 - SPECIALIST - Description of parameters and settings - continued

32

Advertising