Installation accessories, Checklist before installation – H3C Technologies H3C SR6600 User Manual

Page 15

Advertising
background image

7

Installation accessories

Console cable

Grounding cable

Rear mounting

bracket and

load-bearing screw

Front mounting

bracket and M4

screws

Rubber pads

M6 screws

Cage nuts

ESD-preventive

wrist strap

Cable tie

Checklist before installation

Table 6 Checklist before installation

Item Requirements

Result

Ventilation

•

There is a minimum clearance of 10 cm (3.9 in) around the

inlet and exhaust vents for heat dissipation of the router
chassis.

•

A ventilation system is available at the installation site.

Temperature

0°C to 45°C (32°F to 113°F)

Relative humidity

10% to 95% (noncondensing)

Cleanness Dust

concentration

≤ 3 × 10

4

particles/m

3

ESD prevention

•

The equipment and floor are well grounded.

•

The equipment room is dust-proof.

•

The humidity and temperature are at a proper level,
respectively.

•

Wear an ESD-preventive wrist strap and uniform when
touching a circuit board.

•

Place the removed memory module, CF card, or
HIM/MIM on an antistatic workbench, with the face
upward, or put it into an antistatic bag.

•

Touch only the edges, instead of electronic components
when observing or moving a removed memory module,

CF card, or HIM/MIM.

Installation
site

EMI prevention

•

Take effective measures to protect the power system from
the power grid system.

•

Separate the protection ground of the router from the
grounding device or lightning protection grounding
device as far as possible.

•

Keep the router far away from radio stations, radar and
high-frequency devices working in high current.

•

Use electromagnetic shielding when necessary.

Advertising