2 connecting the inverter to the utility grid, Connecting the inverter to the utility grid – SMA SB 1300TL User Manual

Page 25

Advertising
background image

Safety in accordance with IEC 62109 when the grounding conductor monitoring is
deactivated
In order to guarantee safety in accordance with IEC 62109 when the grounding conductor
monitoring is deactivated, carry out one of the following measures:

• Connect a grounding conductor made of copper wire with a cross-section of at least

10 mm² to the connecting terminal plate for the AC cable.

• Connect additional grounding with the same cross-section as the connected grounding

conductor to the connecting terminal plate for the AC cable (see Section 6.3.3, page 27
)
. This prevents touch current if the grounding conductor at the connecting terminal plate
for the AC cable fails.

Connection of additional grounding
In some countries, additional grounding is generally required. In each case, observe the
locally applicable regulations.

6.3.2

Connecting the Inverter to the Utility Grid

Figure 8: Components of the AC connection socket

Position

Designation

A

Bush insert

B

Threaded sleeve

C

Sealing ring PG13.5

D

Fastening case 13.5

E

Pressure screw PG13.5 for cable diameter 7 mm to 10 mm

F

Cable gland M20x1.5 for cable diameter 10 mm to 14 mm

6 Electrical Connection

SMA Solar Technology AG

Operating Manual

25

SB13-21TL-BE-en-11

Advertising
This manual is related to the following products: