3 level ii assessment – Retrotec USACE User Manual

Page 63

Advertising
background image

Chapter 5 41

Ventilation and air-conditioning running times and supply air tempera-

■

tures.
Setpoints and time schedules. Make sure by using trend logging that

■

these are actual values and there is no override by manual settings.
Air handling process operation (heating, cooling, heat recovery, humidi-

■

fying, dehumidifying, etc.).
Use of simultaneous heating and cooling.

■

Operation of fans and pumps (frequency drives, damper and valve con-

■

trols, VAV systems, etc.).
Room temperatures (roughly).

■

Use of windows by building occupants (ventilation through open win-

■

dows).
Magnitude of uncontrolled ventilation, infi ltration.

■

Use of electric appliances, schedules, and stand-by modes.

■

Use of electric heaters, frost protection heating.

■

Most common lamp types.

■

Lighting controls.

■

5.7.3 Level II Assessment

During site assessment

Check items listed in the Level I assessment

■

Measure supply air temperatures, air fl ows of main air handling units,

■

heat-recovery effi ciencies, etc.
Measure room temperatures

■

Analyze operation of heating system

■

Analyze operation of air handling processes

■

Analyze operation of cooling systems

■

Check set-points and operation of room heating and cooling equipment

■

Check and measure the electrical demand of fans, pumps, chillers,

■

lighting, main users of socket power supply
Check reactive power compensation

■

Analyze nighttime energy use (lighting, socket load, fans, pumps, etc.)

■

Analyze summer and winter energy demand

■

The time-depending distribution of electric power consumption = hourly

power demand (if possible).

Advertising