3 verifying the installation – PLANET EPN-102 User Manual

Page 13

Advertising
background image

13

2.3 Verifying the Installation

After power on the ONU, the Power LED will be bright and system starts to boot. When

system is ready, the PON LED will be flash.

If the PON connection is normal, the PON LED will be off and Link LED is ON. And then you

can enjoy the high bandwidth connection via PON technology.

Note:

The PLANET GEPON Solution based on the Teknovus GEPON Technology. The ONU

was designed with PLANET OLT EPL-4000 system. If you connect to third party OLT

system, even the OLT is Teknovus solution; the PON connection still might be unstable

and malfunction, that because the configurations of ONU must depend on the OLT

settings. If the ONU can’t work properly with other brand OLT, please make sure your

PON system and contact the third party OLT vendor for technical support.

Advertising
This manual is related to the following products: