PLANET VC-231 User Manual

Page 22

Advertising
background image

22

3.1.2 VC-231 / VC-234 Connect to Multi-Port Master

In order, to built up a local Internet in apartment, hotel and
campus and hospitality environment.

The Multi-port Master (for example, VC-820M / VC-2400M VDSL2
Switch) need to be placed in the wiring center (MDF room) and
connect to the telephone line system, on the other hand, need
to install a Slave (VC-231 / VC-234 CPE) Converters / Bridge on
the individual client side and connect to the Multi-port Master
through the telephone lines.

When deciding where to put the converter then you must
ensure:

It is accessible and cables can be connected easily.

Cabling is away from sources of electrical noise such as
radios, transmitters and power lines and fluorescent lighting
fixtures.

Water or moisture can not enter the Converters / Bridge.

Air flow around the unit and through the vents in the side
of the case is not restricted (company recommend that you
provide a minimum of 25mm inch clearance).

To prolong the operational life of your units:

Do not place objects on top of any unit or stack.

l

l

l

l

l

Advertising
This manual is related to the following products: