4 inspection, 1 servopack inspection, 2 servopack’s parts replacement schedule – Yaskawa Sigma-5 Safety Precautions for SGDV Servo Amplifier User Manual

Page 22

Advertising
background image

E-20

4 Inspection

4.1 SERVOPACK Inspection

For inspections and maintenance of the SERVOPACK, follow the inspection
procedures in the table below at least once every year.

4.2 SERVOPACK’s Parts Replacement Schedule

The following electric or electronic parts are subject to mechanical wear or
deterioration over time. To avoid failure, replace these parts at the frequency
indicated.

Refer to the standard replacement period in the following table, contact your
Yaskawa representative. After an examination of the part in question, we
will determine whether the parts should be replaced or not.

The parameters of any SERVOPACKs overhauled by Yaskawa are reset to
the factory settings before shipping. Be sure to confirm that the parameters
are properly set before starting operation.

Item

Frequency

Procedure

Remedy

Exterior At least once

a year

Check for dust, dirt, and oil

on surfaces.

Clean with compressed air

or cloth.

Loose

screws

Check for loose terminal

block and connector screws.

Tighten any loose screws.

Part

Standard

Replacement

Period

Operating Conditions

Cooling Fan

4 to 5 years

• Surrounding Air Temperature:

Annual average of 30

°

C

• Load Factor: 80% max.

• Operation Rate: 20 hours/day

max.

Smoothing Capacitor

7 to 8 years

Relays

-

Fuses

10 years

Aluminum Electrolytic

Capacitor on Circuit Board

5 years

Advertising