0 appendix d, Setting the zero & span on the power, 400 power supply/totalizer – gohastings.com POWERPOD 400 User Manual

Page 36

Advertising
background image

Page 36 of 42

Setting the Zero & Span

on the

Power

Pod

-400 Power Supply/Totalizer


All procedures outlined in this document must be performed with the power supply turned on and

warmed up for at least one hour.

All procedures outlined in this document must be performed with NO transducers connected to the
channel being adjusted

*

.

You CANNOT successfully zero a channel without, first, supplying zero volts or four milliamps to
the meter input for that channel.


You CANNOT successfully span a channel without, first, supplying the meter input for that channel

with its appropriate span voltage or span current.


14.1 Zeroing Unit (Voltage Range).

The following instructions explain how to short a given channel’s input signal to ground (0 volts DC)
and set the display to read zero at this voltage.


Locate the 15-pin, ‘D’ type connector that corresponds to the channel to be zeroed.

J1 = Channel 1

J2 = Channel 2
J3 = Channel 3

J4 = Channel 4

Short pin 5 (signal common) to pin 6 (signal in).

Press MODE

Press 3
Press ENTER

Press 1, 2, 3 or 4, depending on which channel is to be zeroed.
Press ENTER

Press 7
Press ENTER
Press 1

Press ENTER
Press ENTER again


You have just told a channel to display zero when the input signal is zero volts

!

.

14.0 Appendix D

Advertising