Installing, Mower – HONDA MM60 User Manual

Page 28

Advertising
background image

INSTALLING

MOWER

&joint Detaches From Mid-PTO

Detaching Mid-PTO and Mower Drive Shaft

1

engine off, PTO selector set to "REAR" and

key removed, reach under tractor and grasp the
locking collar of the U-joint of the mower
shaft.

2. Pull locking collar back (toward front of tractor)

to release spline of Mid-PTO. Pull the U-joint
away from the PTO, towards the mower to
remove.

NOTE:

If

the locking collar is difficult to release,

turning it clockwise and counterclockwise will help
free it.

3.

sure that U-joint is placed where

it

will

not

be

crushed by tractor tires when tractor is

backed over pulley covers.

Arm

Lift

Arms Fasten to Mower Deck

Detaching Lift Joints

when pulling pins as mower deck may drop
slightly.

1.

Pull

pins attaching

lift

joints

to.

lift plates brack-

Keep fingers clear of brackets

ets

as

illustrated.

NOTE:

If

hydraulic

lift

system is not fully down,

pins may be under tension and mower deck may
descend slightly. Make sure to keep fingers clear.

2. After detaching, temporarily replace clevis pins

in brackets and secure with cotter pins

to

keep

from losing or misplacing them. The

lift

joints

should remain attached

to

the mower, not the

lift

arms.

26

Advertising